- Using a hose
Emergency water supply system during disasters - During the Great Earthquake, the industrial water supply was cut off.
Proposal for BCP measures - Large-capacity foam spraying system
- Oil transport system using hoses
- Automatic fuel refueling system using a hose
- Using a hose
Emergency replacement system for loading arms - For pumping groundwater
- Tsunami countermeasures, fire pumps, etc.
High-altitude seawater intake pump system
Plant disaster prevention
engineering
Based on global standards,Basic design of fire extinguishing systems for factories and plants
By designing fire prevention and extinguishing systems in accordance with domestic and international regulations and global standards, we minimize rework and support smooth project progress from the basic design stage onward.
Upon request, we also conduct book reviews after the fire extinguishing equipment manufacturer has been decided.
Problems that can be solved
We can solve these problems!
-
I'm not confident that the documents submitted by the manufacturer meet the project's requirements and international standards.
-
Since a considerable number of years have passed since its construction, we believe that the fire extinguishing system needs to be renovated, but we would like to identify the bottlenecks.
-
In overseas locations and global projects, compliance with local laws and international standards (NFPA/FM standards, etc.) is required, but interpretation and application of these standards can be difficult.
-
I would like you to objectively evaluate the technical validity of the design documents from a neutral standpoint.
Cases
Solutions Offered
Plant disaster prevention system design
We thoroughly examine customer specifications and applicable domestic and international laws and standards, conduct a disaster risk analysis of the entire plant based on our engineering expertise, and then create specifications that serve as the design standards for fire prevention and extinguishing systems. We also minimize rework and support the smooth progress of the project from the basic design stage onward.
Examples of work achievements
- Overseas LNG terminals (cold region)
- Domestic/Overseas Chemical Plants
- Domestic/overseas thermal power plants (and many others)
Health assessment of the main water supply network for firefighting
After creating and updating a comprehensive diagram of the fire extinguishing network for the entire factory, we will perform pressure loss calculations for each fire scenario.
The calculations take into account not only domestic fire safety regulations but also the stricter NFPA standards, considering the effects of aging deterioration, and verify whether the required amount of water is being supplied at sufficient pressure and whether the load ratio of each pump is appropriate.
Furthermore, we will provide concrete improvement proposals, such as pipe replacement and pressure regulating valve installation, and handle everything from implementation to recalculation after the improvements are made.
Examples of work achievements
- Created and updated the overall layout diagram of the main water supply network for firefighting.
- We performed pressure loss calculations considering age-related deterioration for an oil refinery that was several decades old, and proposed improvement plans. We also performed pressure loss calculations after the improvements were made (we have a proven track record of numerous similar projects for refineries).
Fire piping hydraulic calculation
We use specialized software to calculate pressure loss for foam fire extinguishing systems, water spray/spray fire extinguishing systems, sprinkler systems, and other similar systems.
Examples of work achievements
- We performed calculations for a grid-type piping system for a sprinkler system in a warehouse.
- Calculations were performed for the water spraying system targeting multiple pieces of equipment in the process area.